CERTIFICATION OF ENROLLMENT

ENGROSSED SUBSTITUTE HOUSE BILL 2514

Chapter 247, Laws of 1998

(partial veto)

55th Legislature
1998 Regular Session

 

WATERSHED MANAGEMENT

EFFECTIVE DATE: 6/11/98

Passed by the House March 10, 1998
Yeas 88 Nays 10

CLYDE BALLARD

Speaker of the House of Representatives

 

Passed by the Senate March 6, 1998

Yeas 43 Nays 4

CERTIFICATE

I, Timothy A. Martin, Chief Clerk of the House of Representatives of the State of Washington, do hereby certify that the attached is ENGROSSED SUBSTITUTE HOUSE BILL 2514 as passed by the House of Representatives and the Senate on the dates hereon set forth.

 

BRAD OWEN

President of the Senate

TIMOTHY A. MARTIN

Chief Clerk

Approved April 1, 1998, with the exception of sections 10 through 14, which are vetoed. FILED

April 1, 1998 - 2:46 p.m.

GARY LOCKE

Governor of the State of Washington Secretary of State

State of Washington

_______________________________________________

ENGROSSED SUBSTITUTE HOUSE BILL 2514

_______________________________________________

 

AS AMENDED BY THE SENATE

Passed Legislature - 1998 Regular Session

State of Washington 55th Legislature 1998 Regular Session

By House Committee on Appropriations (originally sponsored by Representatives Chandler, Linville, Mastin, Parlette, Koster,

Anderson, Regala and Cooper)

Read first time 02/07/98.
Referred to Committee on .

AN ACT Relating to watershed management; amending RCW 90.82.040, 43.27A.090, and 90.54.040; adding new sections to chapter 90.82 RCW;

adding a new section to chapter 43.27A RCW; adding a new section to chapter 90.54 RCW; and creating new sections.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

Sec. 1. RCW 90.82.040 and 1997 c 442 s 105 are each amended to

read as follows:

(1) Once a WRIA planning unit has been initiated under section 2 of this act and alead agency has been designated, it shall notify the department and may apply to the department for funding assistance for conducting the planning. Funds shall be provided from and to the extent of appropriations made by the legislature to the department expressly for this purpose.

(2) Each planning unit that has complied with subsection (1) of this section is eligible to receive (({- fifty thousand dollars for each WRIA to initiate the planning process. The department shall allocate additional funds to WRIA planning units based on need demonstrated by a detailed proposed budget submitted by the planning unit for carrying out the duties of the planning unit. Each WRIA planning unit may receive up to two hundred fifty thousand dollars for each WRIA during the first two-year period of planning, with a maximum allocation of five hundred thousand dollars for each WRIA.

Funding provided under this section shall be considered a contractual obligation against the moneys appropriated for this purpose -})) {+ watershed planning grants in the following amounts for three phases of watershed planning:

(a) Initiating governments may apply for an initial organizing grant of up to fifty thousand dollars for a single WRIA or up to seventy-five thousand dollars for a multi-WRIA management area in accordance with section 2(4) of this act;

(b) A planning unit may apply for up to two hundred thousand dollars for each WRIA in the management area for conducting watershed assessments in accordance with section 3 of this act; and

(c) A planning unit may apply for up to two hundred fifty thousand dollars for each WRIA in the management area for developing a watershed plan and making recommendations for actions by local, state, and federal agencies, tribes, private property owners, private organizations, and individual citizens, including a recommended list of strategies and projects that would further the purpose of the planin accordance with sections 2, 3, 4, 5, and 6 of this act +}.

(3) (({- Preference shall be given to planning units requesting funding for conducting multi-WRIA planning under section 108 of this act -})) {+

(a) The department shall use the eligibility criteria in this subsection (3) instead of rules, policies, or guidelines when evaluating grant applications at each stage of the grants program.

(b) In reviewing grant applications under this subsection (3), the department shall evaluate whether:

(i) The planning unit meets all of the requirements of this chapter;

(ii) The application demonstrates a need for state planning funds to accomplish the objectives of the planning process; and

(iii) The application and supporting information evidences a readiness to proceed.

(c) In ranking grant applications submitted at each stage of the grants program, the department shall give preference to applications in the following order of priority:

(i) Applications from existing planning groups that have been in existence for at least one year;

(ii) Applications that address protection and enhancement of fish habitat in watersheds that have aquatic fish species listed or proposed to be listed as endangered or threatened under the federal endangered species act, 16 U.S.C. Sec. 1531 et seq. and for which there is evidence of an inability to supply adequate water for population and economic growth from:

(A) First, multi-WRIA planning; and

(B) Second, single WRIA planning;

(iii) Applications that address protection and enhancement of fish habitat in watersheds or for which there is evidence of an inability to supply adequate water for population and economic growth from:

(A) First, multi-WRIA planning; and

(B) Second, single WRIA planning.

(d) The department may not impose any local matching fund requirement as a condition for grant eligibility or as a preference for receiving a grant.

(4) The department may retain up to one percent of funds allocated under this section to defray administrative costs.

(5) Planning under this chapter should be completed as expeditiously as possible, with the focus being on local stakeholders cooperating to meet local needs.

(6) Funding provided under this section shall be considered a contractual obligation against the moneys appropriated for this purpose.

 

Sec. 2. INITIATION OF WATERSHED PLANNING.

(1) Planning conducted under this chapter must provide for a process to allow the local citizens within a WRIA or multi-WRIA area to join together in an effort to:

(a) Assess the status of the water resources of their WRIA or multi-WRIA area; and (b) determine how best to manage the water resources of the WRIA or multi-WRIA area to balance the competing resource demands for that area within the parameters under section 8 of this act.

(2) Watershed planning under this chapter may be initiated for a WRIA only with the concurrence of:

(a) All counties within the WRIA;

(b) the largest city or town within the WRIA unless the WRIA does not contain a city or town; and

(c) the water supply utility obtaining the largest quantity of water from the WRIA. To apply for a grant for organizing the planning unit as provided for under RCW 90.82.040(2)(a), these entities shall designate the entity that will serve as the lead agency for the planning effort and indicate how the planning unit will be staffed.

(3) Watershed planning under this chapter may be initiated for a multi-WRIA area only with the concurrence of:

(a) All counties within the multi-WRIA area;

(b) the largest city or town in each WRIA unless the WRIA does not contain a city or town; and

(c) the water supply utility obtaining the largest quantity of water in each WRIA.

(4) If entities in subsection (2) or (3) of this section decide jointly and unanimously to proceed, they shall invite all tribes with reservation lands within the management area.

(5) The entities in subsection (2) or (3) of this section, including the tribes if they affirmatively accept the invitation, constitute the initiating governments for the purposes of this section.

(6) The organizing grant shall be used to organize the planning unit and to determine the scope of the planning to be conducted. In determining the scope of the planning activities, consideration shall be given to all existing plans and related planning activities. The scope of planning must include water quantity elements as provided in section 3 of this act, and may include water quality elements as contained in section 5 of this act, habitat elements as contained in section 6 of this act, and instream flow elements as contained in section 4 of this act. The initiating governments shall work with state government, other local governments within the management area, and affected tribal governments, in developing a planning process. The initiating governments may hold public meetings as deemed necessary to develop a proposed scope of work and a proposed composition of the planning unit. In developing a proposed composition of the planning unit, the initiating governments shall provide for representation of a wide range of water resource interests.

(7) Each state agency with regulatory or other interests in the WRIA or multi-WRIA area to be planned shall assist the local citizens in the planning effort to the greatest extent practicable, recognizing any fiscal limitations. In providing such technical assistance and to facilitate representation on the planning unit, state agencies may organize and agree upon their representation on the planning unit. Such technical assistance must only be at the request of and to the extent desired by the planning unit conducting such planning. The number of state agency representatives on the planning unit shall be determined by the initiating governments in consultation with the governor's office.

(8) As used in this section, "lead agency" means the entity that coordinates staff support of its own or of other local governments and receives grants for developing a watershed plan.

 

Sec. 3. WATER QUANTITY. Watershed planning

under this chapter shall address water quantity in the management area by undertaking an assessment of water supply and use in the management area and developing strategies for future use.

(1) The assessment shall include:

(a) An estimate of the surface and ground water present in the management area;

(b) An estimate of the surface and ground water available in the management area, taking into account seasonal and other variations;

(c) An estimate of the water in the management area represented by claims in the water rights claims registry, water use permits, certificated rights, existing minimum instream flow rules, federally reserved rights, and any other rights to water;

(d) An estimate of the surface and ground water actually being used in the management area;

(e) An estimate of the water needed in the future for use in the management area;

(f) An identification of the location of areas where aquifers are known to recharge surface bodies of water and areas known to provide for the recharge of aquifers from the surface; and

(g) An estimate of the surface and ground water available for further appropriation, taking into account the minimum instream flows adopted by rule or to be adopted by rule under this chapter for streams in the management area including the data necessary to evaluate necessary flows for fish.

(2) Strategies for increasing water supplies in the management area, which may include, but are not limited to, increasing water supplies through water conservation, water reuse, the use of reclaimed water, voluntary water transfers, aquifer recharge and recovery, additional water allocations, or additional water storage and water storage enhancements. The objective of these strategies is to supply water in sufficient quantities to satisfy the minimum instream flows for fish and to provide water for future out-of-stream uses for water identified in subsection (1)(e) and (g) of this section and to ensure that adequate water supplies are available for agriculture, energy production, and population and economic growth under the requirements of the state's growth management act, chapter 36.70A RCW. These strategies, in and of themselves, shall not be construed to confer new water rights. The watershed plan must address the strategies required under this subsection.

 

Sec. 4. INSTREAM FLOWS. (1)

(a) If the initiating governments choose, by majority vote, to include an instream flow component, it shall be accomplished in the following manner:

(i) If minimum instream flows have already been adopted by rule for a stream within the management area, unless the members of the local governments and tribes on the planning unit by a recorded unanimous vote request the department to modify those flows, the minimum instream flows shall not be modified under this chapter. If the members of local governments and tribes request the planning unit to modify instream flows and unanimous approval of the decision to modify such flow is not achieved, then the instream flows shall not be modified under this section;

(ii) If minimum stream flows have not been adopted by rule for a stream within the management area, setting the minimum instream flows shall be a collaborative effort between the department and members of the planning unit. The department must attempt to achieve consensus and approval among the members of the planning unit regarding the minimum flows to be adopted by the department. Approval is achieved if all government members and tribes that have been invited and accepted on the planning unit present for a recorded vote unanimously vote to support the proposed minimum instream flows, and all nongovernmental members of the planning unit present for the recorded vote, by a majority, vote to support the proposed minimum instream flows.

(b) The department shall undertake rule making to adopt flows

under (a) of this subsection. The department may adopt the rules

either by the regular rules adoption process provided in chapter

34.05 RCW, the expedited rules adoption process as set forth in RCW

34.05.230, or through a rules adoption process that uses public

hearings and notice provided by the county legislative authority to

the greatest extent possible. Such rules do not constitute

significant legislative rules as defined in RCW 34.05.328, and do not

require the preparation of small business economic impact statements.

(c) If approval is not achieved within four years of the date the

planning unit first receives funds from the department for conducting

watershed assessments under RCW 90.82.040, the department may

promptly initiate rule making under chapter 34.05 RCW to establish

flows for those streams and shall have two additional years to

establish the instream flows for those streams for which approval is

not achieved.

(2)(a) Notwithstanding RCW 90.03.345, minimum instream flows set

under this section for rivers or streams that do not have existing

minimum instream flow levels set by rule of the department shall have

a priority date of two years after funding is first received from the

department under RCW 90.82.040, unless determined otherwise by a

unanimous vote of the members of the planning unit but in no instance

may it be later than the effective date of the rule adopting such

flow.

(b) Any increase to an existing minimum instream flow set by rule

of the department shall have a priority date of two years after

funding is first received for planning in the WRIA or multi-WRIA area

from the department under RCW 90.82.040 and the priority date of the

portion of the minimum instream flow previously established by rule

shall retain its priority date as established under RCW 90.03.345.

(c) Any existing minimum instream flow set by rule of the

department that is reduced shall retain its original date of priority

as established by RCW 90.03.345 for the revised amount of the minimum

instream flow level.

(3) Before setting minimum instream flows under this section, the

department shall engage in government-to-government consultation with

affected tribes in the management area regarding the setting of such

flows.

(4) Nothing in this chapter either: (a) Affects the department's

authority to establish flow requirements or other conditions under

RCW 90.48.260 or the federal clean water act (33 U.S.C. Sec. 1251 et

seq.) for the licensing or relicensing of a hydroelectric power

project under the federal power act (16 U.S.C. Sec. 791 et seq.); or

(b) affects or impairs existing instream flow requirements and other

conditions in a current license for a hydroelectric power project

licensed under the federal power act.

(5) If the planning unit is unable to obtain unanimity under

subsection (1) of this section, the department may adopt rules

setting such flows.

{+ NEW SECTION. +} Sec. 5. WATER QUALITY. If the initiating

governments choose to include a water quality component, the

watershed plan shall include the following elements:

(1) An examination based on existing studies conducted by

federal, state, and local agencies of the degree to which legally

established water quality standards are being met in the management

area;

(2) An examination based on existing studies conducted by

federal, state, and local agencies of the causes of water quality

violations in the management area, including an examination of

information regarding pollutants, point and nonpoint sources of

pollution, and pollution-carrying capacities of water bodies in the

management area. The analysis shall take into account seasonal

stream flow or level variations, natural events, and pollution from

natural sources that occurs independent of human activities;

(3) An examination of the legally established characteristic uses

of each of the nonmarine bodies of water in the management area;

(4) An examination of any total maximum daily load established

for nonmarine bodies of water in the management area, unless a total

maximum daily load process has begun in the management area as of the

date the watershed planning process is initiated under section 2 of

this act.

(5) An examination of existing data related to the impact of

fresh water on marine water quality;

(6) A recommended approach for implementing the total maximum

daily load established for achieving compliance with water quality

standards for the nonmarine bodies of water in the management area,

unless a total maximum daily load process has begun in the management

area as of the date the watershed planning process is initiated under

section 2 of this act; and

(7) Recommended means of monitoring by appropriate government

agencies whether actions taken to implement the approach to bring

about improvements in water quality are sufficient to achieve

compliance with water quality standards.

This chapter does not obligate the state to undertake analysis or

to develop strategies required under the federal clean water act (33

U.S.C. Sec. 1251 et seq.). This chapter does not authorize any

planning unit, lead agency, or local government to adopt water

quality standards or total maximum daily loads under the federal

clean water act.

{+ NEW SECTION. +} Sec. 6. HABITAT. If the initiating

governments choose to include a habitat component, the watershed plan

shall be coordinated or developed to protect or enhance fish habitat

in the management area. Such planning must rely on existing laws,

rules, or ordinances created for the purpose of protecting,

restoring, or enhancing fish habitat, including the shoreline

management act, chapter 90.58 RCW, the growth management act, chapter

36.70A RCW, and the forest practices act, chapter 76.09 RCW.

Planning established under this section shall be integrated with

strategies developed under other processes to respond to potential

and actual listings of salmon and other fish species as being

threatened or endangered under the federal endangered species act, 16

U.S.C. Sec. 1531 et seq. Where habitat restoration activities are

being developed under chapter . . ., Laws of 1998 (Engrossed

Substitute House Bill No. 2496), such activities shall be relied on

as the primary nonregulatory habitat component for fish habitat under

this chapter.

{+ NEW SECTION. +} Sec. 7. IDENTIFICATION OF PROJECTS AND

ACTIVITIES. The planning unit shall review historical data such as

fish runs, weather patterns, land use patterns, seasonal flows, and

geographic characteristics of the management area, and also review

the planning, projects, and activities that have already been

completed regarding natural resource management or enhancement in the

management area and the products or status of those that have been

initiated but not completed for such management in the management

area, and incorporate their products as appropriate so as not to

duplicate the work already performed or underway.

The planning group is encouraged to identify projects and

activities that are likely to serve both short-term and long-term

management goals and that warrant immediate financial assistance from

the state, federal, or local government. If there are multiple

projects, the planning group shall give consideration to ranking

projects that have the greatest benefit and schedule those projects

that should be implemented first.

{+ NEW SECTION. +} Sec. 8. PLAN PARAMETERS. (1) Watershed

planning developed and approved under this chapter shall not contain

provisions that: (a) Are in conflict with existing state statutes,

federal laws, or tribal treaty rights; (b) impair or diminish in any

manner an existing water right evidenced by a claim filed in the

water rights claims registry established under chapter 90.14 RCW or

a water right certificate or permit; (c) require a modification in

the basic operations of a federal reclamation project with a water

right the priority date of which is before the effective date of this

section or alter in any manner whatsoever the quantity of water

available under the water right for the reclamation project, whether

the project has or has not been completed before the effective date

of this section; (d) affect or interfere with an ongoing general

adjudication of water rights; (e) modify or require the modification

of any waste discharge permit issued under chapter 90.48 RCW; (f)

modify or require the modification of activities or actions taken or

intended to be taken under a habitat restoration work schedule

developed under chapter . . ., Laws of 1998 (Engrossed Substitute

House Bill No. 2496); or (g) modify or require the modification of

activities or actions taken to protect or enhance fish habitat if the

activities or actions are: (i) Part of an approved habitat

conservation plan and an incidental take permit, an incidental take

statement, a management or recovery plan, or other cooperative or

conservation agreement entered into with a federal or state fish and

wildlife protection agency under its statutory authority for fish and

wildlife protection that addresses the affected habitat; or (ii) part

of a water quality program adopted by an irrigation district under

chapter 87.03 RCW or a board of joint control under chapter 87.80

RCW. This subsection (1)(g) applies as long as the activities or

actions continue to be taken in accordance with the plan, agreement,

permit, or statement. Any assessment conducted under section 3, 5,

or 6 of this act shall take into consideration such activities and

actions and those taken under the forest practices rules, including

watershed analysis adopted under the forest practices act, chapter

76.09 RCW.

(2) Watershed planning developed and approved under this chapter

shall not change existing local ordinances or existing state rules or

permits, but may contain recommendations for changing such ordinances

or rules.

(3) Notwithstanding any other provision of this chapter,

watershed planning shall take into account forest practices rules

under the forest practices act, chapter 76.09 RCW, and shall not

create any obligations or restrictions on forest practices additional

to or inconsistent with the forest practices act and its implementing

rules, whether watershed planning is approved by the counties or the

department.

{+ NEW SECTION. +} Sec. 9. DECISIONS--HEARINGS--APPROVAL.

(1)(a) Upon completing its proposed watershed plan, the planning unit

may approve the proposal by consensus of all of the members of the

planning unit or by consensus among the members of the planning unit

appointed to represent units of government and a majority vote of the

nongovernmental members of the planning unit.

(b) If the proposal is approved by the planning unit, the unit

shall submit the proposal to the counties with territory within the

management area. If the planning unit has received funding beyond

the initial fifty thousand dollars under RCW 90.82.040, such a

proposal approved by the planning unit shall be submitted to the

counties within four years of the date the funding was first received

by the planning unit.

(c) If the watershed plan is not approved by the planning unit,

the planning unit may submit the components of the plan for which

agreement is achieved using the procedure under (a) of this

subsection, or the planning unit may terminate the planning process.

(2)(a) The legislative authority of each of the counties with

territory in the management area shall provide public notice of and

conduct at least one public hearing on the proposed watershed plan

submitted under this section. After the public hearings, the

legislative authorities of these counties shall convene in joint

session to consider the proposal. The counties may approve or reject

the proposed watershed plan for the management area, but may not

amend it. Approval of such a proposal shall be made by a majority

vote of the members of each of the counties with territory in the

management area.

(b) If a proposed watershed plan is not approved, it shall be

returned to the planning unit with recommendations for revisions.

Approval of such a revised proposal by the planning unit and the

counties shall be made in the same manner provided for the original

watershed plan. If approval of the revised plan is not achieved, the

process shall terminate.

(3) The planning unit shall not add an element to its watershed

plan that creates an obligation unless each of the governments to be

obligated has at least one representative on the planning unit and

the respective members appointed to represent those governments agree

to adding the element that creates the obligation. A member's

agreeing to add an element shall be evidenced by a recorded vote of

all members of the planning unit in which the members record support

for adding the element. If the watershed plan is approved under

subsections (1) and (2) of this section and the plan creates

obligations: (a) For agencies of state government, the agencies

shall adopt by rule the obligations of both state and county

governments and rules implementing the state obligations, the

obligations on state agencies are binding upon adoption of the

obligations into rule, and the agencies shall take other actions to

fulfill their obligations as soon as possible; or (b) for counties,

the obligations are binding on the counties and the counties shall

adopt any necessary implementing ordinances and take other actions to

fulfill their obligations as soon as possible.

(4) As used in this section, "obligation" means any action

required as a result of this chapter that imposes upon a tribal

government, county government, or state government, either: A fiscal

impact; a redeployment of resources; or a change of existing policy.

*{+ NEW SECTION. +} Sec. 10. PERMIT PROCESSING. Nothing in

this chapter may be interpreted as authorizing or directing the

department to establish a moratorium on the investigation of and

decisions on applications for permits for the withdrawal of surface

water or ground water, or changes or transfers of water rights under

existing permits.

*Sec. 10 was vetoed. See message at end of chapter.

*{+ NEW SECTION. +} Sec. 11. A new section is added to chapter

43.27A RCW to read as follows:

If planning is being conducted under chapter 90.82 RCW or a plan

has been adopted under section 9 of this act, the department shall

not conduct planning under this chapter that conflicts with the

planning being conducted under chapter 90.82 RCW or a plan that has

been adopted under section 9 of this act.

*Sec. 11 was vetoed. See message at end of chapter.

*{+ NEW SECTION. +} Sec. 12. A new section is added to chapter

90.54 RCW to read as follows:

If planning is being conducted under chapter 90.82 RCW or a plan

has been adopted under section 9 of this act, the department shall

not conduct planning under this chapter that conflicts with the

planning being conducted under chapter 90.82 RCW or a plan that has

been adopted under section 9 of this act.

*Sec. 12 was vetoed. See message at end of chapter.

*Sec. 13. RCW 43.27A.090 and 1988 c 127 s 25 are each amended to

read as follows:

The department shall be empowered as follows:

(1) To represent the state at, and fully participate in, the

activities of any basin or regional commission, interagency

committee, or any other joint interstate or federal-state agency,

committee or commission, or publicly financed entity engaged in the

planning, development, administration, management, conservation or

preservation of the water resources of the state.

(2) To prepare the views and recommendations of the state of

Washington on any project, plan or program relating to the planning,

development, administration, management, conservation and

preservation of any waters located in or affecting the state of

Washington, including any federal permit or license proposal, and

appear on behalf of, and present views and recommendations of the

state at any proceeding, negotiation or hearing conducted by the

federal government, interstate agency, state or other agency.

(3) To cooperate with, assist, advise and coordinate plans with

the federal government and its officers and agencies, and serve as a

state liaison agency with the federal government in matters relating

to the use, conservation, preservation, quality, disposal or control

of water and activities related thereto.

(4) To cooperate with appropriate agencies of the federal

government and/or agencies of other states, to enter into contracts,

and to make appropriate contributions to federal or interstate

projects and programs and governmental bodies to carry out the

provisions of this chapter.

(5) To apply for, accept, administer and expend grants, gifts and

loans from the federal government or any other entity to carry out

the purposes of this chapter and make contracts and do such other

acts as are necessary insofar as they are not inconsistent with other

provisions hereof.

(6) To develop and maintain a coordinated and comprehensive state

water and water resources related development plan, and adopt, with

regard to such plan, such policies as are necessary to insure that

the waters of the state are used, conserved and preserved for the

best interest of the state. There shall be included in the state

plan a description of developmental objectives and a statement of the

recommended means of accomplishing these objectives. To the extent

the director deems desirable, the plan shall integrate into the state

plan, the plans, programs, reports, research and studies of other

state agencies. {+ A plan adopted under chapter 90.82 RCW satisfies

the requirements of planning under this section. +}

(7) To assemble and correlate information relating to water

supply, power development, irrigation, watersheds, water use, future

possibilities of water use and prospective demands for all purposes

served through or affected by water resources development.

(8) To assemble and correlate state, local and federal laws,

regulations, plans, programs and policies affecting the beneficial

use, disposal, pollution, control or conservation of water, river

basin development, flood prevention, parks, reservations, forests,

wildlife refuges, drainage and sanitary systems, waste disposal,

water works, watershed protection and development, soil conservation,

power facilities and area and municipal water supply needs, and

recommend suitable legislation or other action to the legislature,

the congress of the United States, or any city, municipality, or to

responsible state, local or federal executive departments or

agencies.

(9) To cooperate with federal, state, regional, interstate and

local public and private agencies in the making of plans for

drainage, flood control, use, conservation, allocation and

distribution of existing water supplies and the development of new

water resource projects.

(10) To encourage, assist and advise regional, and city and

municipal agencies, officials or bodies responsible for planning in

relation to water aspects of their programs, and coordinate local

water resources activities, programs, and plans.

(11) To promulgate such rules and regulations as are necessary to

carry out the purposes of this chapter.

(12) To hold public hearings, and make such investigations,

studies and surveys as are necessary to carry out the purposes of the

chapter.

(13) To subpoena witnesses, compel their attendance, administer

oaths, take the testimony of any person under oath and require the

production of any books or papers when the department deems such

measures necessary in the exercise of its rule-making power or in

determining whether or not any license, certificate, or permit shall

be granted or extended.

*Sec. 13 was vetoed. See message at end of chapter.

*Sec. 14. RCW 90.54.040 and 1997 c 32 s 2 are each amended to

read as follows:

(1) The department, through the adoption of appropriate rules, is

directed, as a matter of high priority to insure that the waters of

the state are utilized for the best interests of the people, to

develop and implement in accordance with the policies of this chapter

a comprehensive state water resources program which will provide a

process for making decisions on future water resource allocation and

use. The department may develop the program in segments so that

immediate attention may be given to waters of a given physioeconomic

region of the state or to specific critical problems of water

allocation and use. {+ A plan adopted under chapter 90.82 RCW

satisfies the requirements of planning under this section. +}

(2) In relation to the management and regulatory programs

relating to water resources vested in it, the department is further

directed to modify existing regulations and adopt new regulations,

when needed and possible, to insure that existing regulatory programs

are in accord with the water resource policy of this chapter and the

program established in subsection (1) of this section.

(3) The department is directed to review all statutes relating to

water resources which it is responsible for implementing. When any

of the same appear to the department to be ambiguous, unclear,

unworkable, unnecessary, or otherwise deficient, it shall make

recommendations to the legislature including appropriate proposals

for statutory modifications or additions. Whenever it appears that

the policies of any such statutes are in conflict with the policies

of this chapter, and the department is unable to fully perform as

provided in subsection (2) of this section, the department is

directed to submit statutory modifications to the legislature which,

if enacted, would allow the department to carry out such statutes in

harmony with this chapter.

*Sec. 14 was vetoed. See message at end of chapter.

{+ NEW SECTION. +} Sec. 15. CAPTIONS. As used in this act,

captions constitute no part of the law.

{+ NEW SECTION. +} Sec. 16. Sections 2 through 10 of this act

are each added to chapter 90.82 RCW.

{+ NEW SECTION. +} Sec. 17. If specific funding for the

purposes of this act, referencing this act by bill or chapter number,

is not provided by June 30, 1998, in the omnibus appropriations act,

this act is null and void.

Passed the House March 10, 1998.

Passed the Senate March 6, 1998.

Approved by the Governor April 1, 1998, with the exception of

certain items that were vetoed.

Filed in Office of Secretary of State April 1, 1998.

Note: Governor's explanation of partial veto is as follows:

"I am returning herewith, without my approval as to sections 10

through 14, Engrossed Substitute House Bill No. 2514 entitled:

"AN ACT Relating to watershed management;"

ESHB 2514 establishes a watershed management process to develop

in-stream flow levels, water quality and habitat plans. A primary

purpose of the watershed management planning under this bill is to

address listed and soon-to-be listed salmon stocks under the federal

Endangered Species Act, as well as finding ways to meet the needs of

those who rely upon out-of-stream uses of water.

This bill has the potential to resolve the long-standing

stalemate over setting in-stream flow levels in Washington and to

resolve other important issues dealing with water quality and fish

habitat. I commend the Legislature for its leadership in this

regard.

ESHB 2514 makes a strong choice to rely on watershed planning

processes to resolve these issues. Primary responsibility lies with

the planning units authorized by this bill to meet the requirements

of state and federal law. Given the status of our water and

fisheries resources, we cannot afford to approach these problems

without a sense of urgency and determination. If progress is not

being made in this area, I am prepared to utilize existing authority

to protect our water and fish habitat, and will be prepared to

propose further legislative changes next year.

ESHB 2514 has one problem in that tribal governments are

relegated to a secondary role throughout the planning process,

despite treaty rights and fishery co-management responsibilities. To

address that problem, I am directing the Department of Ecology to

consult with affected tribes, including those with usual and

accustomed territory or ceded lands, before committing to obligate

the state on any particular in-stream flow levels or other issues

that affect tribal treaty rights and co-management responsibilities.

 

Section 10 of this bill would prohibit the Department from

establishing a moratorium on water right processing while planning is

underway. In some select instances, the Department of Ecology may

need to impose a moratorium on water right processing in order to

preserve options for future water allocations by the watershed

planning unit.

Sections 11 through 14 would require that plans developed under

this bill preempt water-related planning processes established under

other statutes. This language would remove any flexibility of the

state to use other authorities to correct any deficiencies that

emerge from plans adopted under the process provided in this bill.

If such plans turn out to be inadequate due to new information and

situations, the state would be prohibited by these sections from

correcting the problems.

For these reasons, I have vetoed sections 10 through 14 of

Engrossed Substitute House Bill No. 2514.

With the exception of sections 10 through 14, Engrossed

Substitute House Bill No. 2514 is approved."